Texas Lien Law Firm, PLLC
Lubbock Mechanics Liens
(281) 205-0652
Broadway Street reconstruction in downtown Lubbock with brick pavers and fresh concrete

Lubbock Mechanics Lien Lawyers — Flat Fee, Fast Filing

For Lubbock-area contractors, subcontractors, and suppliers who haven't been paid for their work.

Begin Your Lien

A member of our team will contact you within one business day.

What's Being Built in Lubbock Right Now

Broadway Street Reconstruction

Broadway Street Reconstruction

$17.3M bond project replacing aging brick between Avenues Q and E with concrete and modern brick pavers, underway in phases through the two-year build.

Upland Avenue Widening

Upland Avenue Widening

Widening from two to five lanes between 34th and 50th Streets, with planning underway to extend the project south toward 98th Street.

Loop 88 & US 87 / FM 41 Bridge

Loop 88 & US 87 / FM 41 Bridge

Ongoing TxDOT and city work on the Loop 88 routing project and the US 87/FM 41 bridge rehabilitation.

Pickering Park & Downtown Revitalization

Pickering Park & Downtown Revitalization

A new downtown green space with a concert stage and family zones, built by Teinert Construction, targeting late 2026/early 2027 completion alongside the Broadway Market development.

Parallel Lubbock Student Housing
Texas Tech Campus

Parallel Lubbock Student Housing

A 671-unit student housing community on the Texas Tech campus, built by Teinert Construction, targeting a Fall 2027 opening.

H-E-B's Second Lubbock Store & Chick-fil-A Distribution Center

H-E-B's Second Lubbock Store & Chick-fil-A Distribution Center

A new H-E-B and fuel station on 19th Street (late 2027) alongside a $46M distribution facility at 407 Lubbock Business Park Blvd. (mid-2027).

Big project or small, every contractor and supplier on these jobs is working under the same Chapter 53 deadlines.

Texas Lien Deadlines Are Strict

Texas has some of the most technical mechanics lien deadlines in the country under Chapter 53 of the Texas Property Code. Missing a deadline can mean permanently losing your right to payment — regardless of how much you're owed or how clear the debt is. This applies to contractors and suppliers in Lubbock just as strictly as anywhere else in the state.

Find Your Deadline

Enter your details, then press the button to see your key Texas deadlines.

One Flat Fee — $599

One price. No hourly billing. Your flat fee includes:

  • ✓Pre-lien notice to the owner and general contractor
  • ✓Preparation of your lien affidavit
  • ✓Filing with the Lubbock County Clerk
Cotton fields and wind turbines on the flat High Plains horizon near Lubbock

Serving Lubbock and the South Plains

Lubbock sits at the center of the South Plains — a mix of downtown revitalization, Texas Tech-driven growth, major road and bond projects, and the agricultural and wind-energy activity that shapes the wider region. Liens for Lubbock-area projects are recorded with the Lubbock County Clerk. Texas Lien Law Firm handles the notices, filings, and paperwork so Lubbock contractors and suppliers can focus on their work, not the legal process.

Understanding Chapter 53

Constitutional & statutory basis

Article XVI, §37 of the Texas Constitution grants lien rights to mechanics, artisans, and material suppliers. Chapter 53 of the Texas Property Code sets out the procedures that make those rights enforceable.

Who can file

Original contractors, subcontractors, suppliers, specialty fabricators, and certain design professionals who furnish labor or materials for improvements to real property.

Residential vs. commercial

Residential projects carry shorter deadlines and extra requirements, including specific statutory notice language and protections for homestead property.

Tiered notice structure

Subcontractors and suppliers must send notice to the owner and original contractor (§53.056) before filing. The affidavit must meet §53.054 content rules, be filed by the §53.052 deadline, and be served per §53.055–§53.057, including notice of retainage claims under §53.057.

How We Handle It

  1. 1Free intake call — we review your contract, invoices, and what you're owed.
  2. 2We confirm your role and whether the project is residential or commercial.
  3. 3We calculate every notice and filing deadline that applies to you.
  4. 4We verify the owner, general contractor, and legal property description from county records.
  5. 5We prepare and send the required pre-lien notices by certified mail.
  6. 6We prepare your lien affidavit to Chapter 53 requirements.
  7. 7We file the affidavit with the Lubbock County Clerk and send the required copies.
  8. 8We follow up with you on release, payment, or next steps to enforce.

We verify all of the information so your lien holds up.

Frequently Asked Questions

+How long do I have to file a mechanics lien in Lubbock, Texas?

For projects begun on or after January 1, 2022, the lien affidavit generally must be filed by the 15th day of the fourth month after the month your work was completed (the third month on residential projects). Subcontractors and suppliers must also send notice by the 15th day of the third month after each unpaid month (the second month on residential).

+How much does it cost to file a lien in Lubbock?

Our flat fee is $599 and covers the pre-lien notice, preparation of the lien affidavit, and filing. County recording fees charged by the Lubbock County Clerk are separate.

+Where do I file a mechanics lien in Lubbock County?

The lien affidavit is recorded in the real property records of the Lubbock County Clerk. Copies must also be sent to the owner and, where required, the original contractor.

+Can I file a lien on a TxDOT or city bond project like Broadway Street or the Loop 88 bridge?

No — public property can't be liened. On public projects such as TxDOT roadwork or city bond projects, your protection is a claim against the contractor's payment bond under Chapter 2253 of the Texas Government Code, which has its own notice deadlines. We handle those claims too.

+Do I need a lawyer to file a mechanics lien in Texas?

No law requires one, but Chapter 53 is unforgiving about deadlines, notice content, and property descriptions. A defective or late filing can be invalid.

+What if I'm a supplier and never had a contract with the owner?

Suppliers and subcontractors can still have lien rights, but only if the required notices are sent on time. That's why the notice deadlines matter as much as the filing deadline.

+What happens after my lien is filed?

The lien appears in the public records, which often prompts payment. If not, it must be enforced by lawsuit — generally within one year (residential) or two years (commercial).

Contact Us

Tell us about the unpaid work and we'll follow up with next steps.